Artificial intelligence is changing the way data centres are designed. As network speeds move from 400G to 800G and 1.6T, copper cabling is reaching its physical limits. This is driving demand for optical fibre. The need for fibre is also rising within and between server racks. Fibre counts in switch racks have increased from around 500 in conventional cloud setups to 12,000 in 72-GPU server nodes.